O-Train West

Updated on February 18, 2025

Lines 1& 3

The O‑Train West extension is the third phase in Ottawa’s transit expansion.

We’re extending Line 1 from Tunney’s Pasture to Algonquin and introducing new Line 3, linking Trim to Moodie.
We're adding 15 kilometres of rail and 11 new stations.

It also offers seamless connections to nature and recreation, with easy access to Westboro Beach and Wesley Clover Parks.

Stations in the west

Explore all stations

O-Train west

Transfer stations

Lines 1 & 3 connection

Map showing Bayview as the transfer station between O-Train Line 2 and Line 1

Lincoln Fields Station

Park & Ride and bus connections

Map showing South Keys as the transfer station between Line 2 and Line 4

Trim Station

Lines 1& 2 connection

Map showing Bayview as the transfer station between O-Train Line 2 and Line 1

Bayview Station

11
New stations
15
Km of new rail
1
New O-Train line

Line 1

Tunney’s Pasture – Algonquin



 

Overview

Extending Line 1 from Tunney's Pasture to Algonquin adding 7 stations along the way

You will be able to travel from Trim in Orléans to Algonquin College and the Nepean area, without leaving your seat.

 

Highlights

  • Identified by the familiar red circle on maps and signs 1
  • Includes 7 new stations
  • 5 Park & Ride lots along the line
  • Runs on the same track as Line 3 between Lincoln Fields and Trim stations
  • Direct connection to Algonquin College
  • 100% electric Alstom Citadis Spirit vehicles, for a quiet ride with zero emissions
7
New Stations
8.5
Kilometres of Rail
2
Schools connected
 

Bus icon

Bus and Para Transpo connections

Train icon

Transitway connections to Kanata and Barrhaven.

Train icon

VIA Rail direct access

Bridge icon

4 Pedestrian bridges




A map of Line 1 west, illustrating the journey from Tunney's Pasture to Algonquin station

Line 1 west extension route map.

Destinations

New places to discover

Line 3

 

Tunney's Pasture – Moodie



 

 

Overview

Line 3 is the newest addition to the Ottawa O‑Train network. It provides a swift, continuous route from Trim in the east to Moodie in the west.

Line 3 features modern and well-situated O‑Train stations. It will provide frequent service, unaffected by traffic conditions.

O-Train Line 3 will run parallel to the extended Line 1 for most of its route, splitting at Lincoln Field and continuing west towards Moodie station.

Highlights

  • Spot Line 3 with its signature gold circle symbol
  • A total of 27 stations
  • Includes 9 new stations
  • Runs parallel to Line 1 for most of its route
  • Go from Orléans to Nepean with zero transfers
  • Transfer between Lines 1 and 3 at Lincoln Fields Station
  • 4 Park & Ride lots
  • 100% electric Alstom Citadis Spirit vehicles, for a quiet ride with zero emissions
  • New maintenance and storage facility at Corkstown Yard, near Moodie Station
9
New Stations
4
Park & Ride Lots
16
Kilometres of rail

Plane iconTrain icon

Connection to the airport and VIA Rail

Bus icon

Bus and Para Transpo connections

Bridge icon

2 Pedestrian bridges

A map of Line 3 west, illustrating the journey from Tunney's Pasture to Moodie station

Line 3 west extension route map.

Destinations

New places to discover

Are you interested in the O‑Train Extension?

Don’t miss an update. Subscribe for the latest project updates and construction news.

Subscribe