O-Train West
Lines 1& 3
The O‑Train West extension is the third phase in Ottawa’s transit expansion.
We’re extending Line 1 from Tunney’s Pasture to Algonquin and introducing new Line 3, linking Trim to Moodie.
We're adding 15 kilometres of rail and 11 new stations.
It also offers seamless connections to nature and recreation, with easy access to Westboro Beach and Wesley Clover Parks.
Stations in the west
Explore all stations
O-Train west
Transfer stations
Line 1
Tunney’s Pasture – Algonquin
Overview
Extending Line 1 from Tunney's Pasture to Algonquin adding 7 stations along the way
You will be able to travel from Trim in Orléans to Algonquin College and the Nepean area, without leaving your seat.
Highlights
- Identified by the familiar red circle on maps and signs 1
- Includes 7 new stations
- 5 Park & Ride lots along the line
- Runs on the same track as Line 3 between Lincoln Fields and Trim stations
- Direct connection to Algonquin College
- 100% electric Alstom Citadis Spirit vehicles, for a quiet ride with zero emissions
Bus and Para Transpo connections
Transitway connections to Kanata and Barrhaven.
VIA Rail direct access
4 Pedestrian bridges
Line 1 Line 1
West extension routing
Destinations
New places to discover
Line 3
Tunney's Pasture – Moodie
Overview
Line 3 is the newest addition to the Ottawa O‑Train network. It provides a swift, continuous route from Trim in the east to Moodie in the west.
Line 3 features modern and well-situated O‑Train stations. It will provide frequent service, unaffected by traffic conditions.
O-Train Line 3 will run parallel to the extended Line 1 for most of its route, splitting at Lincoln Field and continuing west towards Moodie station.
Highlights
- Spot Line 3 with its signature gold circle symbol
- A total of 27 stations
- Includes 9 new stations
- Runs parallel to Line 1 for most of its route
- Go from Orléans to Nepean with zero transfers
- Transfer between Lines 1 and 3 at Lincoln Fields Station
- 4 Park & Ride lots
- 100% electric Alstom Citadis Spirit vehicles, for a quiet ride with zero emissions
- New maintenance and storage facility at Corkstown Yard, near Moodie Station
Connection to the airport and VIA Rail
Bus and Para Transpo connections
2 Pedestrian bridges
Line 3 Line 3
West extension routing
Destinations
New places to discover
Are you interested in the O‑Train Extension?
Don’t miss an update. Subscribe for the latest project updates and construction news.
Subscribe